
48″ × 36″ Hot Tap with Double 3/4″ Line Freezes by Flow Control Solutions
Flow Control Solutions recently completed a complex live pipeline project featuring a 48″ × 36″ hot tap on a carbon steel pipeline along with two

Flow Control Solutions recently completed a complex live pipeline project featuring a 48″ × 36″ hot tap on a carbon steel pipeline along with two

Flow Control Solutions recently completed two 10-inch single line freezing projects, demonstrating our experience in performing complex maintenance on live piping systems with minimal disruption.

Check out one of our recent pipeline projects. Flow Control Solutions successfully completed a 48-inch double line stop and hot taps on an AWWA C301L

At Flow Control Solutions, we specialize in delivering safe, efficient pipeline solutions that minimize downtime and keep critical infrastructure operating. Our team recently completed a

As temperatures drop, keeping your heating systems operating reliably becomes more important than ever. Unexpected shutdowns can lead to costly repairs, operational delays, and uncomfortable

We’ve recently completed several valve insertion projects and wanted to share a closer look at how this specialized service helps municipalities, utilities, and industrial facilities

Reliable access to clean drinking water depends on well-maintained water infrastructure. When critical transmission mains serving hospitals, airports, manufacturing facilities, or entire communities require repairs

Introduction: Fire hydrant winterization, also referred to as fall servicing, minor servicing, or B servicing, is an important preventive maintenance procedure that helps keep hydrants

What is Line Stopping? Line stopping, also referred to as line plugging, is a specialized method used to temporarily isolate a section of an active

At Flow Control Solutions, we provide comprehensive fire hydrant inspection, maintenance, repair, and flow testing services for municipalities and water utilities across Ontario. Our specialized